HDD Projects
Pipe Reaming Botswana
2023
Botswana upsizing of existing 300mm to new 450mm HDPE for 495 meters by means of Pipe Reaming
HDD Heidelberg (Hard Ground)
2022
Heidelberg Horizontal Directional Drilling (HDD) & HDPE Butt-Welding for 160mm water lines
HDD Fleurhof Soweto (Rock Drilling)
2022
Soweto 180mm sewer crossing (HDD) in hard rock & HDPE Butt-Welding
HDD Lenasia (Water and Sewer)
2022
Lenasia 160mm water and sewer crossings HDD soft and boulder ground conditions
HDD Eldorado Park (River Crossing)
2022
Our longest HDD crossing for the year started off in Eldorado Park where we were tasked with installing a 450mm HDPE pipe for over a distance of 170 meters in one continuous pull.
HDD Bloemfontein (Soft to Rock)
2022
Our first HDD project for 2022 started in Bloemfontein with ground conditions ranging from soft to solid rock.